Ongoing Works |
|
|
WORKS ON HAND AS A PRIME CONTRACTOR (As on 31st July, 2016) |
Sl. No. |
Description of Project |
Client |
Contract
Value (Rs.in Crs.) |
Work Completed (Rs. In Crs.) |
Balance Work (Rs.In Crs.) |
1 |
IFFC Project-Construction of Link Canal from Km.0.00 to Km.6.90 and Branch Canal to connect to MMR R/s Canal beyond Thotapally from Km.0.00 to Km.1.250, including CM &CD works in Karimnagar district |
SE I&CAD I.F.F.C CIRCLE-II, KARIMNAGAR |
82.12 |
15.00 |
67.12 |
2 |
IFFC Project from SRSP: Construction of spillway from 16 to 26 Blocks upto Crest level i.e.El.+309.25 mts. Including glacis concrete, pier concrete, slotted Roller bucket concrete and Apron concrete, R/s End pier and R/S NOF 1 to 4 Blocks upto Road Bridge Top level i.e., El.+323.900 mts., R/s D/s Retaining wall concrete and R/s Core wall with all allied components including instrumentation arrangements etc., (excluding Drilling & Grouting, Generator sets, Transformer & Switch yard, Electrification and Formation of Coffer Dam) and formation of Right side Earth Bund upto TBL El.+323.00 mts from R/s Retaining wall to end of Earth bund Ch.9.250 Km. including all items, instrumentation arrangements etc. (Excluding R/S OT sluice structure at Ch8.525 KM)- Mid-Manair Near(V), Boinpally(M), Karimnagar Dist. |
SE I&CAD I.F.F.C CIRCLE-II, KARIMNAGAR |
101.88 |
25.00 |
76.88 |
3 |
Construction of Cement Concrete Lining with paver machine & Manually from Km. 0.00 KM to 28.23KM of sirmour distributory with PVC, Joints, C.N.S. Layer of Keoti Main Canal under Bansagar Project. |
Govt. of M.P.
Water Resources Department |
12.68 |
10.50 |
2.18 |
4 |
Rehabilitation and Modernization of Minor Canal System under WUA’s 173 Mittapalli and 174 Muddunuru of Distributory Committee No.21 Kallur of NSLBC, T.S., |
SE, NSLBC O&M Circle,
Khammam |
7.43 |
7.23 |
0.20 |
5 |
Improvements to Nippulavagu from Km 8.100 to Km 11.500, construction of 2 Nos Inlets, Formation of standard Banks -Reach.II of Kurnool District under KC Canal Division, Nandyal |
SE, I & CAD, Kurnool,,A.P. |
15.17 |
7.50 |
7.67 |
6 |
Improvements to Nippulavagu from Km 11.500 to Km 14.600, construction of 2 Nos Inlets, Formation of standard Banks - Reach. III of Kurnool District under KC Canal Division, Nandyal |
SE, I & CAD, Kurnool, A.P. |
13.78 |
8.25 |
5.53 |
7 |
Lining Work Of Nebuha Distributory Km. 0 to 23.52 of Keoti Canal Under Bansager Project |
Govt.of M.P.
WRD |
15.80 |
10.75 |
05.05 |
|
|
|
|
IFFC Project MidManair Karimnagar work in Progress |
IFFC Project Thotapally Karimnagar work in Progress |
|
|
WORKS ON HAND AS A SUB CONTRACTOR (As on 31th July, 2016) |
1 |
Construction of Road works, Bridges & Culverts and other associated works for the permanent campus of the Central University of Jammu (CUJ) at Village Bagla, J&K. |
SEW Infrastructure Limited |
264.00 |
135.00 |
129.00 |
2 |
Construction of Earthwork, lining, structures and service road for Morbi Branch Canal Ch.32.92 to 118.86 (Pkg-II) |
175.20 |
170.09 |
5.11 |
3 |
Construction of Kutch Branch canal reach Ch.201.206 to Ch.214.740 km Earthwork C.C Lining, structures, Service Road, Gate work, Control Cabin of (Pkg-I; Reach-I) |
SEW Infrastructure Limited |
110.00 |
109.4 |
0.66 |
4 |
Excavation of Gravity Canal including formation of embankment, construction of sluices, CM & CD works, lining of main canal, complete for the reach from KM.41.850 to KM.52.400 (Pranahita Chevella Pkg-IV) |
Sushee Infra Pvt Ltd. |
125.80 |
46.01 |
78.92 |
5 |
FFC from SRSP - Formation of Gouravelly Reservoir with gross capacity of 1.410 TMC Water including construction of H.C. Weir, Forming Earth Dam, Head Regulators on left and right side, formation of diversion Road near Gouravelly (V), Karimnagar Dist. |
BVSR Constructions |
43.13 |
25.09 |
18.14 |
6 |
Execution/Completion of Balance works of Bansagar Canal Project including Canal Lining and Structures in District Sidhi (M.P ) Mirzapur and Allahabad(U.P) |
Rithwik Projects (P) Ltd |
44.59 |
15.00 |
29.59 |
7 |
Hamirpur Canal Lining works (Lalithpur Utter Pradesh) |
SEW I Ltd. |
30.00 |
16.71 |
13.28 |
8 |
Construction of Roadbed, Minor & Major bridges between Km.10.00 to Km.35.00 in connection with New B.G. electrified double line in the state of Chhattisgarh over SEC Railway between Kharsia - Dharamjaygarh. |
SMS Infrastructure Ltd., Nagpur |
95.29 |
45.00 |
50.29 |
|
|
|
|
Bridge work of Central University Jammu in Progress |
Blanketing Production work of Kharshia work in Progress |
|
|
|
|
Bansagar Canal, Mirzapur Work in Progress (UP) |
Excavation of Morbi Branch Canal works in Progress |
|
|
|
|