Completed Works |
|
|
Works Completed as a Prime Contractor |
Sl.
No |
Name of the Project |
Client |
Contract Value
(Rs.in Crs.) |
1 |
AVR HNSS Project Phase-I - Package No.1 (Sub work): Execution of earthwork and forming embankment of Malyala approach Channel from Km (-) 4.806 to KM (-) 3.722 with 253.000 level at KM (-) 4.806 and from KM (-) 3.722 to KM (-) 1.922 from (+) 261.900 level to a level as per the approved HPs sections, designs and drawings and specifications etc. |
Superintending Engineer, AVR HNSS Circle No.1
Kurnool |
13.32 |
2 |
Investigation, Design and Earthwork excavation of GNSS Main canal from KM.311.000 to KM.334.000 including construction of CM & CD works and formation of Vepagunta Reservoir and its distributory system including field channels to feed an ayacut of 5000 acres and formation of Adavikothuru Reservoir and it's distributory system including field channels to feed an ayacut of acres under GNSS in Chittoor District under Package.14 of GNSS Phase-II." |
Superintending Engineer,
T.G.P & GNSS Circle, Srikalahasti |
7.34 |
3 |
Construction of Trough Aqueduct in place of Damaged B.T.U.T @ KM 116.950, repairs to Pipe U.T @ KM 117.075 and SLB@ KM 117.085 of SSG Canal (TGP) |
SE, TGP & GNSS Circle, Tirupati |
5.30 |
4 |
Earth work in formation, blanketing, trolley refuge and construction of various minor bridges including misc. works like pitching, toe wall etc. from Viramgam to Jhund in connection with Viramgam - Samakhiyali Doubling Project. |
Western Railway, Ahmedabad |
5.74 |
5 |
Earth work in formation, blanketing, trolley refuge and construction of various minor bridges including misc. works like pitching, toe wall etc. from Jhund to Sadla in connection with Viramgam - Samakhiyali Doubling Project. |
Western Railway, Ahmedabad |
5.99 |
6 |
Formation of 'D' Bund (Balance portion) including protection work from KM.0.000 to KM.0.900 of TGP Main canal (from KM.0.580 to KM.0.900 from EL(+)214.000 to EL: (+)226.000) |
S.E.T.G.P Circle, Kadapa |
0.98 |
7 |
Restoration of Bund of Tadukuvagu Reservoir near Thambalapalli(V)in Kalasapadu (M) of YSR Dist.Kadapa |
S.E.,
Irrigation Cricle,
Kadapa |
0.60 |
|
|
|
|
|
|
Works Completed as a Sub - Contractor |
Sl. No |
Name of the Project |
Principal Contractor |
Contract Value
(Rs. in Crs.) |
1 |
Earthwork excavation, soft & hard rock, forming embankment, site grading for formation of Service Road, WBM road work and RCC&CC lining including key wall & CC Dowel wall etc for Kutch and Morbi Branch Canal of Gujrat State. |
SEW Infrastructure Limited, Hyderabad |
100.54 |
2 |
Construction of Raw Water Reservoir and Ash Dyke for 2X685 MW Tidla Power Plant (TPP) for GMR Energy Limited at Raikheda Near Raipur. |
80.64 |
3 |
Pkg No.14/06-Investigation, Designs and Earth Work excavation of GNSS Main Canal from Km 311.00 of 334.000 formation of Vepagunta Reservoir and formation of Adavikothur Reservoir and its distributory system under GNSS Main Canal in Chittoor Dist. on EPC. |
Ratna Infrastructure Projects Pvt. Ltd. |
91.99 |
4 |
Construction of Earth work, lining, structures and service road for Kutch Branch Canal Ch.93.0 to 100.100 Km (Pkg-I) |
NCC Ltd. |
113.65 |
5 |
Earthwork activities at Shimoga Regional Airport |
BM Wire Walls |
17.00 |
6 |
Excavation of loose soil and excavation forming embankment of SRBC canal from KM 10 to KM 12 & KM 14 to KM 17 |
Sushee Hitech |
15.00 |
7 |
Construction of D1 Type Quarters - 34 Nos, Field Hostel, EDC and ET Hostel at NTPC Simhadri, Vishakhapatnam |
SEW Infrast-ructure Ltd |
13.50 |
8 |
Formation of Earthdam of Jonnalaboguda balancing reservoir from km0.450 to km0.850 including E.W.excavation &forming embankment of gravity canal from km 8.0to km9.0 of Kalwakurthy lift irrigation scheme Mahabubnagar Dist. |
BVSR Constructions |
14.82 |
9 |
Excavation forming of embankment of Handri Niva Sujala Sravanthi Main Canal from 31 Km to 32 Km at Kurnool District. |
Kolan Engineering |
8.50 |
10 |
Excavation forming embankment of flood flow canal Km 86t 87 of SRSP in Karimnagar District. |
Sushee Hitech |
8.57 |
11 |
Earthwork activities at Gulbarga Regional Airport |
Bharat Nirman |
5.00 |
12 |
Earthwork excavation forming embankment of SRBC canal form Km 2 to 3. |
Ratna Constructions |
4.12 |
13 |
Excavation & forming embankment of Kalvakurthy Canal MGLIS, Mahaboobnagar |
Madhucon |
4.00 |
14 |
Excavation forming of embankment of Handri Niva Sujala Sravanthi Main Canal from 17 Km to 20 Km and km 4at Kurnool District. |
Rithwik projects |
2.00 |
|
|
|
|